Town of Clyde, NC 90-day Test Pilot
April 2014 – The Town of Clyde has been maintaining an aging system and BluTower was able to demonstrate to them a revenue windfall that will come with replacing their inaccurate meters. They have agreed to a 90-day test pilot with our fully integrated radio meter, BluMet. The Town of Clyde does not want to just replace old meters anymore but also wants to take advantage of the oppurtunity to automate them at the same time. It is a proven fact that newer, accurate meters will increase revenue to the utility while at the same time saving them money in the form of reduced man hours required to read the system. It’s truly a “win win” situation for the Town of Clyde and BluTower is honoured to have been chosen for this test pilot.